Core Documents S
- S1 - CMC1 Agenda 27.05.2026
- S2 - Inspector' Pre CMC1 Note 27.05.2026
- S3 - Inspector's Post CMC1 note 28.05.2026
- S5 - PIN1 Inspector's Decision on Methodology for Assessing Cumulative Effectx
- S6 - CMC2 Agenda 27.07.2026
- S7 - Inspector's Post CMC Note 27.07.2026
- S8 - Topic based Inquiry 27.07.2026
- S9 - PIN 2 Inspector's Decision on Withdrawal of ORL material 30.07.26
- S10- PIN3 Inspector's Decision on Amended Description of Development and Parameter Plans 06.08.26
- S11- Letter_from_Oxfordshire_Railfreight_Limited_to_PINS 14 July 2025