Core Documents A
- A1 Application Forms (A1)
- A2 plans on which decision based
- A3 Cover Letter vf (A3)
- A4 Planning Statement Rev A (A4)
- A5 14-019-SGP-XX-XX-DR-A-131001 Red Line Location Plan (A5)
- A6 14-019-SGP-XX-XX-DR-A-131003 Split Level Parameter Plan (A6)
- A7 14-019-SGP-XX-XX-DR-A-001010 Illustrative Masterplan - Option 2 (A7)
- A8 Site Access Plan 216285-PD01 Rev B (A8)
- A9 Health Impact Assessment (A9)
- A10 Market Report Issue (A10)
- A11 Labour Market Assessment Issue (A11)
- A12 14-019 Design and Access Statement (A12)
- A13 Agricultural Land Classification Report (A13)
- A14 Sustainability Statement (A14)
- A15 Waste Management Strategy (A15)
- A16 Framework CEMP (A16)
- A17 Statement of Community Involvement (A17)
- A18 i 21339-21-TOPOGRAPHICAL-R2 A0-SOUTH_PLAN (A18)
- A18 ii 21339-21-TOPOGRAPHICAL-R2 A0-N-S_PLAN (A18)
- A18 iii 21339-21-TOPOGRAPHICAL-R2 A0-NORTH_PLAN (A18)
- A19 i HC140910 Ardley topo Sheet 1 (A19)
- A19 ii HC140910 Ardley topo Sheet 2 (A19)
- A19 iii HC140910 Ardley topo Sheet 3 (A19)
- A19 iv HC140910 Ardley topo Sheet 4 (A19)
- A20 T_21_2503-55-01 - Drainage Layout - Sheet 1_P6 (A20)
- A21 T_21_2503-55-02 - Drainage Layout - Sheet 2_P5 (A21)
- A22 T_21_2503-55-03 - Drainage Layout - Sheet 3_P5 (A22)
- A23 T_21_2503-55-04 - Flood Exceedance Route - Sheet 1_P2 (A23)
- A24 T_21_2503-55-05 - Flood Exceedance Route - Sheet 2_P2 (A24)
- A25 T_21_2503-55-06 - Flood Exceedance Route - Sheet 3_P2 (A25)
- A26 Symmetry Park, Ardley. ES Main Report (A26)
- A27 Symmetry Park, Ardley. ES Non-Technical Summary (A27)
- A28 ES Appendix 01.1 Assessor Information (A28)
- A29 i ES Appendix 05.1 Transport Assessment 220413_Part 1 (A29)
- A29 ii ES Appendix 05.1 Transport Assessment 220413Part 2 (A29)
- A30 ES Appendix 06.1 to 06.5 Air quality_v1.1 (A30)
- A31 ES Appendix 07.1 and 7.2 Noise_V1.0 (A31)
- A32 ES Appendix 08.1 Ecological Baseline r008Arfs (A32)
- A33 edp2355_r016-A-BIA Report non corrupt-compressed (A33)
- A33 ES Appendix 08.2 BIA report r016 (A33)
- A34 i ES Appendix 09.1 LVIA Baseline r006_Part1 (A34)
- A34 ii ES Appendix 09.1 LVIA Baseline r006_Part2 (A34)
- A35 ES Appendix 09.2 Table of Effects_ Visual r010 (A35)
- A36 ES Appendix 09.3 Cumulative Assessment (A36)
- A37 ES Appendix 09.4 AIA 2355_r012 reduced (A37)
- A38 i ES Appendix 09.5 External Lighting Design (A38)
- A38 ii ES Appendix 09.5 External Lighting Typical (A38)
- A39 ES Appendix 09.6 Illus Landscape Strategy d024b (A39)
- A48 Cover Email Dated 190423 compressed (B2)
- A40 ES Appendix 09.7 Wirelines Low Res d044a (A40)
- A41 ES Appendix 09.8 Landscape sections d038 (A41)
- A42 ES Appendix 10.1 Arch and Heri Assessment r014 (A42)
- A43 i ES Appendix 10.2 Geophysical Survey_Part1 (A43)
- A43 ii ES Appendix 10.2 Geophysical Survey_Part2 (A43)
- A43 iii ES Appendix 10.2 Geophysical Survey_Part3 (A43)
- A43 iv ES Appendix 10.2 Geophysical Survey_Part4 (A43)
- A43 v ES Appendix 10.2 Geophysical Survey_Part5 (A43)
- A44 ES Appendix 10.3 Preapp Consult Resp and WSIs (A44)
- A45 ES Appendix 11.1 - FRA V1.3 (A45)
- A46 i ES Appendix 14.1 PRA RP-GE-001-V02_Part1 (A46)
- A46 ii ES Appendix 14.1 PRA RP-GE-001-V02_Part2 (A46)
- A46 iii ES Appendix 14.1 PRA RP-GE-001-V02_Part3 (A46)
- A46 iv ES Appendix 14.1 PRA RP-GE-001-V02_Part4 (A46)
- A47 AN0619 Symmetry Park Ardley archaeological evaluation FINAL_compressed (B1)
- A48 Cover Email Dated 190423 compressed (B2)
- A49 216285-A-14A A43 Baynards Green Roundabout - GA (B3)
- A50 Cover Email 170424 (B4)
- A51 Cover Letter Final 1 (B5)
- A52 Symmetry Park, Ardley. Environmental Statement 2024 (B6)
- A53 Symmetry Park, Ardley. ES Non-Technical Summary 2024 (B7)
- A56 ES Appendix 05.2 TA Addendum (B10)
- A57 to A61 ES Appendix 06 Air Quality_r6.3 (B11 to B15 )
- A66 ES Appendix 08.3 Ecological Baseline_r020c (B20)
- A67 ES Appendix 08.4 BNG Assessment_r021-A (B21)
- A68 i ES Appendix 09.1 LVIA_r006_D_Part1 (B22)
- A68 ii ES Appendix 09.1 LVIA_r006_D_Part2 (B22)
- A68 iii ES Appendix 09.1 LVIA_r006_D_Part3 (B22)
- A69 ES Appendix 09.2 Table of Effects_Visual_r010-C (B23)
- A70 ES Appendix 09.3 Cumulative Assessment_r011-B (B24)
- A71 ES Appendix 09.4 AIA_r012_reduced (B25)
- A72 ES Appendix 09.5 Wirelines_d044b[low res] (B26)
- A73 ES Appendix 09.6 Photomontages_d045a_[low res] (B27)
- A74 i ES Appendix 09.7 External Lighting Design (B28)
- A74 ii ES Appendix 09.7 External Lighting Typical Lighting Levels (B28)
- A75 ES Appendix 09.8 Illustrative Landscape Strategy_d024-C (B29)
- A76 ES Appendix 09.9 Illustrative Landscape Sections_d038-A (B30)
- A77 i ES Appendix 10.1_r014_d_Part1 Arch and Her (B31)
- A77 ii ES Appendix 10.1_r014_d_Part2 Arch anf Her (B31)
- A77 iii ES Appendix 10.1_r014_d_Part3 Arch and Her (B31)
- A77 iv ES Appendix 10.1_r014_d_Part4 Arch and Her (B31)
- A77 v ES Appendix 10.1_r014_d_Part5 Arch and Her (B31)
- A77 vi ES Appendix 10.1_r014_d_Part6 Arch and Her (B31)
- A79 ES Appendix 10.3 Pre-application Consultation_r024_a (B33)
- A80 i ES Appendix 10.4 WSI a_r007 (B34)
- A80 ii ES Appendix 10.4 WSI b ASWYAS Geophysical Survey (B34)
- A80 iii ES Appendix 10.4 WSI c Cotswold Archaeology WSI (B34)
- A80 iv ES Appendix 10.4 WSI d Cotswold Archaeology MS (B34)
- A81 ES Appendix 10.5 WSI_r022_e LR (B35)
- A82 ES Appendix 11.1 FRA_v3_Part1 (B36)
- A82 ES Appendix 11.1 FRA_v3_Part2 (B36)
- A82 ES Appendix 11.1 FRA_v3_Part3 (B36)
- A82 ES Appendix 11.1 FRA_v3_Part4 (B36)
- A86 ES Figure 03.1 Parameter Plan 131003-P6 (B40)
- A87 ES Figure 03.2 Illustrative Masterplan 001010-P8 (B41)
- A88 ES Figure 04.1 Cumulative Sites (B42)
- A102 ES Figure 08.1 Phase 1 Habitats Plan (B56)
- A103 ES Figure 08.2 Designated Sites (B57)
- A105 ES Figure 09.2 Environmental planning context d020d (B59)
- A106 ES Figure 09.3 Published landscape character d021c (B60)
- A108 ES Figure 09.5 Findings of visual appraisal d023d (B62)
- A110 ES Figure 10.2 HER Records (B64)
- A124 Planning Statement (B69)
- A125 Design and Access Statement E (B70)
- A126 Transport Topic Paper (B71)
- A127 Market Report Update I (B72)
- A128 Sustainability Statement (B73)
- A129 14-019-SGP-XX-XX-DR-A-131001 Red Line-P2 (B74)
- A130 14-019-SGP-XX-XX-DR-A-131003 P6 Parameters (B75)
- A131 14-019-SGP-XX-XX-DR-A-001010-P8 Masterplan (B76)
- A132 Submission Schedule Final (B77)
- A133 i Cover email from WCC Archaeology 260624 (B78)
- A133 ii MK1066 Symmetry Park, Ardley, Oxfordshire.-1.0 (B78)
- A134 Cover email 010724 (B79)
- A137 Symmetry Park, Ardley_FRA_v4_compressed (B80)
- A138 10364407-HDR-XX-XX-DR-C-305-P1 Existing Surface Water Catchment (B81)
- A139 10387367 - EA Surface Water Flood Map (B82)
- A140 Cover email 040924 (B83)
- A141 edp2355_r008-A-Technical Appendix 8.1_ Ecological Baseline (B84)
- A142 edp2355_r020-C-Technical Appendix 8.1_ Ecological Baseline Update (B85)
- A143 edp2355_r031-D-Ecology Response to Council Comments (B86)
- A144 2355_r026 Metric 3.0 V2 (B87)
- A145 cover email 311024 (B88)
- A146 ES 2025 update note Final (B89)
- A147 Appendix A Topic Paper Addendum - Final (B90)
- A148 216285 - L01 Response to Highways - Final (B91)
- A149 Cover Email 070225 (B92)
- A150 NPPF letter 110325 (B93)
- A151 edp2355_r032-B-Response to CDC (B94)
- A152 2355_r026 Metric 3.0 _03.05.24 (B95)
- A153 edp2355_r033 Draft Landscape and Ecological Management Plan (B96)
- A154 Cover email 120325 1(B97)
- A155 x ES Figure 06 Air Quality (B98)
- A155 viii 17213-18c Appendix G Modelling Report (B98)
- A155 ix 17213-18c Appendix G Modelling Annexe A (B98)
- A155 i 17213-18c Appendix G Modelling Annexe B (B98)
- A155 ii 17213-18c Appendix G Modelling Annexe C (B98)
- A155 iii 17213-18c Appendix G Modelling Annexe D (B98)
- A155 iv 17213-18c Appendix G Modelling Annexe E (B98)
- A155 v 17213-18c Appendix G Modelling Annexe F (B98)
- A155 vi 17213-18c Appendix G Modelling Annexe G (B98)
- A155 vii 17213-18c Appendix G Modelling Annexe H (B98)
- A156 cover email 170325 (B99)
- A157 edp2355_r033 Draft Landscape and Ecological Management Plan (B100)
- A158 Cover email 290425 (B101)
- A159 14-019-SGP-XX-XX-DR-A-131003 Split Level Parameter-P14 (B102)
- A160 Cover email 180625 (B103)
- A161 300625 Letter 1 final (B104)
- A162 300625 Letter 2 C final (B105)
- A163 Ardley 28.05.24 (B106)
- A164 2025 07 16 - Letter to David Peckford (B107)
- A165 edp2355_d065-B-Offsite Mitigation Measures (B108)
- A166 edp2355_r034_reduced (B109)
- A167 2025 07 21 Cover Letter Final pdf (B112)
- A168 Symmetry Park Ardley ES Addendum July 2025 (B113)
- A168 ES Addendum Chapter 8 - Biodiversity (2) (B114)
- A169 i ES Addendum Chapter 9 - Landscape and visual effects (Part 1 of 3) (B115)
- A169 ii ES Addendum Chapter 9 - Landscape and visual effects (Part 2 of 3) (B115)
- A169 iii ES Addendum Chapter 9 - Landscape and visual effects (Part 3 of 3) (B115)
- A169 iv ES Addendum Chapter 9 - Landscape and visual effects_Part1 (B115)
- A169 v ES Addendum Chapter 9 - Landscape and visual effects_Part2 (B115)
- A170 ES Addendum Figure 3.1 Split Level Parameter (B116)
- A171 14-019-SGP-STE-XX-DR-A-111005-P02-Offsite Mitigation Plan (B117)
- A172 Document_2025-07-24_180759 (B118)
- A174 edp2355_r037-A-Updated Photomontage Key Points (B119)
- A175 cover email 060825 (B120)
- A176 Illustrative Section Through Eastern Bund edp2355_d063e-1.10 (B121)
- A177 cover email 070825 (B122)
- A178 email 220825 (B123)
- A179 2025 09 1 Cover Letter Final (B124)
- A180 Off Site Mitigation Areas and Archaeology (B125)
- A181 i 300625 Letter 2 C final (1) (B126)
- A181 ii 300625 Letter 2 C final (2) (B126)
- A182 Document_2025-09-16_160021 (B127)
- A183 14-019-SGP-STE-XX-DR-A-111006 - Site Location Plan with Title Boundaries-P (1) (B128)
- A184 Document_2025-07-24_180759 (B129)
- A185 edp2355_r033 Draft Landscape and Ecological Management Plan_compressed (B130)
- A186 14-019-SGP-STE-XX-DR-A-111005-P02-Offsite Mitigation Plan (B131)
- A187 edp2355_d063e-1.10_compressed (B132)
- A188 Submission Schedule September 2025 9B (133)
- A189 Symmetry Park, Ardley - ES Addendum September 2025 (B134)
- A190 ES Addendum Chapter 8 Ecology (1) (B140)
- A190 ES Addendum Chapter 8 Ecology - CONFIDENTIAL_Redacted (B140)
- A191 ES Addendum Chapter 9 Landscape (B141)
- A192 ES Addendum Chapter 10 Archaeology (B142)
- A193 ES Appendix 8.5 BNG Metric (B143)
- A194 ES Appendix 8.6 Farmland Bird Mitigation Strategy (1) (B144)
- A195 ES Appendix 9.10 Landscape Mitigation and Management Note_compressed (B145)
- A196 ES Appendix 9.11 Updated Photomontage Key Points (B146)
- A197 ES Appendix 10.6 Consultation Emails (B147)
- A198 ES Appendix 10.7 Geophysical Survey Report (B148)
- A199 ES Appendix 10.8 CFA, 2019a, West Meadow (B149)
- A199 ES Appendix 10.9 CFA, 2019b West Meadow (B149)
- A200 ES Addendum Figure 3.1 Split Level Parameter (B151)
- A201 ES Figure 8.3 Protected Species Plan - CONFIDENTIAL (B152)
- A202 ES Figure 8.4 Update Wintering Bird Survey Results - November 2024 (B153)
- A203 ES Figure 8.5 Update Breeding Bird Survey Results 2025 (B154)
- A204 ES Figure 8.6 Post-Development Habitats Plan (B155)
- A205 ES Figure 9.6 Strategic Landscape and Ecological Mitigation Measures (B156)
- A206 ES Figure 10.1 Offsite Mitigation Areas and Archaeology - LiDAR (B157)
- A207 ES Figure 10.2 West Meadow - LiDAR Features (B158)
- A208 071125 Cover Letter Reg 25 pdf (B159)
- A209 Symmetry Park, Ardley - ES Addendum November 2025 (B160)
- A210 ES Appendix 5.3 - ES Sensitivity Tests V2 (B161)
- A211 ES Appendix 8.5 - Updated Biodiversity Net Gain Metric (edp2355_r038b) (B162)
- A212 ES Appendix 8.6 - Farmland Bird Mitigation Strategy (edp2355_r047) (B163)
- A213 ES Appendix 8.7 - Bat Activity Technical Note (edp2355_r048) (B164)
- A214 ES Appendix 8.8 - Dormouse Survey Results (edp2355_r049) (B165)
- A215 ES Figure 4.1 Cumulative Schemes Map (93784-SAV-ARD-CSM-4.1-V4) (B166)
- A216 ES Figure 8.6 - Post-Development Habitats Plan (edp2355_d072b) (B167)
- A217 edp2355_r033 Draft Landscape Ecological Management Plan (B168)
- A218 Conditions Ecology (B169)
- A219 216285-Site Access Roundabout-V1 - Junctions 11 Report (1) (B170)
- A220 Site Access Flow V1 (B171)
- A221 cover email 281125 (B172)
- A222 cover email 271125 (B173)
- A223 cover email 251125 to OCC (B174)
- A224 Market Report Update Issue (3)